Previous Page  62 / 237 Next Page
Information
Show Menu
Previous Page 62 / 237 Next Page
Page Background

58

www.semotank.com

Semo Tank / Baker Equipment Co.

BTI Easy Open Tee Adjustment Procedure

BTI Easy Open Pipe Hanger Kit

BTI Easy Open Pipe Hanger Installation

Part Number:

Item:

BT-6EO-PH:

Description:

BT-PH-HANGER

BT-PH-UBOLT-6OE

WSR-500

NUT-LK-500C

BLT-HX-500C1.5

BT-PH-L-BRKT

BT-PH-UBOLT-4

WSR-375

NUT-LK0375C

1

2

3

4

5

6

7

8

9

1

1

4

4

2

2

2

4

4

Hanger Bar

U-bolt for 6” EO Collar

Flat Washer 1/2”

Lock Nut 1/2-13

Hex Head Bolt 1/2-13

L-Bracket

U-bolt for 4” Pipe

Flat Washer 3/8”

Lock Nut 3/8-16

Tools Required for Installation:

• 9/16” Wrench

• 2- 3/4” Wrenches

Before installing pipe hanger kit:

• Make sure easy open tee is properly installed and adjusted.

• Make sure pipes are cut to give proper 1/4” clearance to end of tee.

• Clamp pipes in place using couplers.

Step 1

Install the hanger bar on top of the collar. Secure it in

place using the large u-bolt, washers, and locknuts.

Make sure the hanger bar is parallel to the unload

line before tightening nuts.

Step 2

Assemble the L-brackers and small u-bolts. Hand

tighten the nuts at this point.

Step 3

Align the L-bracket with the hanger bar and the

small U-bolts. Tighten the nuts for the small U-bolts.

Last tighten the nits for the 1/2-13 bolts.